(022) 42830750 [email protected]
Social Media :
Excelling in Publication and Media Programs, SEI Successfully Wins Two Trophies

Excelling in Publication and Media Programs, SEI Successfully Wins Two Trophies

It was a source of pride for the SEI family when SEI managed to bring home two proud trophies, namely the Award Trophy as the Company with the Best Publication at the 2024 Association of Economic Journalists Business Awards (IWEB Awards 2024) and the Award Trophy for the Media Relations Awards 2024 Category, Sub-Category for the Best Media Relations Program at the 78th United Press Company Awards.

SEI was considered successful in its efforts to communicate well to the mass media and the public and also participated in supporting the national economy, especially through publications, so that it was finally selected as the recipient of the Best Publication award from the 2024 IWEB Award alongside PT Kereta Api Indonesia (Persero) which managed to bring home the trophy in the same category.

The next award came from the oldest press company organization in Indonesia, namely the Press Company Union (SPS). Carrying out the Humanist Collaboration program between companies and the Mass Media, SEI has succeeded in creating good and healthy relations that have played a role in building a positive image and reputation so that SEI was selected as the winner of the 2024 Media Relations Awards Category Sub-Category Best Media Relations Program along with other leading companies, namely PT Pupuk Indonesia (Persero), PT Mineral Industri Indonesia (Persero), Bank Central Asia, Tbk, PT Astra International, Tbk, etc.

"Hopefully the company's success this time can be an inspiration for other corporate communities to continue to actively contribute, convey positive, precise and accurate information that will have an impact on the wider community," said I Made Sandika, President Director of SEI. **

Trending! Alfamidi Now Installs Rooftop Solar Power Plants in Its Midimarkets

Trending! Alfamidi Now Installs Rooftop Solar Power Plants in Its Midimarkets

Tangerang, Banten (22/9/24) – The trend of Rooftop PLTS is increasingly mushrooming in Indonesia, apart from the trend of Rooftop PLTS becoming a necessity in the government or private sector to save electricity bills, one example is PT Midi Utama Indonesia Tbk, a subsidiary of Alfamart which operates in the midimarket sector, has switched to new renewable energy. SEI in collaboration with PLN ICON Plus installed Rooftop PLTS in 2 Alfamidi Super locations, namely Teluknaga and Kutabumi, Tangerang, Banten. The total installed Rooftop PLTS capacity is 180 kWp (Teluknaga capacity 90.09 kWp & Kutabumi capacity 90.09 kWp).

This Alfamidi PLTS has entered the interconnection or energize stage, this stage is a requirement to obtain an Operational Certificate (SLO). After obtaining the SLO, the Rooftop PLTS can be operated. At this stage, SEI checks from Quality Control to the PLTS trial.

"In this installation process, according to the S curve, it should be completed on September 27, but we can finish it 1 month earlier, so that on August 22, we can carry out the interconnection or energize," said Nurisma, SEI Project Manager.

Alfamidi plans to increase capacity at several other points to support new renewable energy and show as an example that supermarket or minimarket outlets can be installed with Rooftop PLTS to save on electricity bills.

Don’t Ignore! These Are the Mandatory Equipment When Installing Solar Panels

Don’t Ignore! These Are the Mandatory Equipment When Installing Solar Panels

Solar panel installation is a job that requires compliance with safety standards. Including when installing on a rooftop or ground mounted. This installation process involves working at heights and requires special attention to avoid the risk of accidents. To ensure safety, every worker must be equipped with adequate safety equipment. The use of appropriate equipment not only protects workers from potential hazards, but also ensures that the installation of solar panels is carried out with optimal quality.

In order to achieve these goals, here is the mandatory equipment that must be used by every worker when installing solar panels:

  1. Safety Helmet

Safety Helmet is the main protection for the head when working on a solar panel installation project. This helmet must be used to protect workers from the risk of shapes, falling objects, or other hazards that may occur in the work area.

  1. Safety Glasse

When installing solar panels, workers are susceptible to dust, debris or splashes of material that can hit the eyes. Therefore, eye protection is a mandatory PPE to use.

  1. Safety Gloves

Safety Gloves protect workers from physical hazards such as sharp objects, heat or chemicals during the installation of solar panels. Various types of gloves are chosen according to the type of work, thick gloves are needed to protect against sharp objects, while insulating gloves must be used in work that protects against electric shock.

  1. Safety Shoes

Special shoes are used to protect the feet from sharp objects that can fall during the installation process. The use can help prevent foot injuries and ensure comfort during work, protecting the feet from sharp objects, slipping, and electric currents.

  1. Wearpack 

Protective clothing designed to protect the entire body from mechanical risks. The form is a jumpsuit (overalls) designed for worker comfort and mobility. Equipped with pockets so that it is easy to carry important tools or equipment while working.

The use of complete and standard PPE is very important to keep workers safe during the installation of solar panels. Starting from helmets, gloves, to protective shoes.

By complying with safety protocols, the risk of accidents can be minimized and project productivity maintained. Occupational safety must always be the top priority in every stage of the project, for the success and welfare of all workers. Because Safety Is SEI Priority!

Medical Check Up: Form of Company Commitment to Realizing Occupational Health and Safety

Medical Check Up: Form of Company Commitment to Realizing Occupational Health and Safety

Bandung (09/09/2024), as an effort to increase awareness of the importance of Occupational Health and Safety (K3), PT Surya Energi Indotama, a pioneer company in the renewable energy sector, held a Medical Check Up program for employees located at SEI in collaboration with Pindad General Hospital.

In its implementation, this program is divided into three categories, namely the first category is intended for employees over 40 years of age or who have comorbidities, the second category is intended for company structural officials and the third category is for the Board of Directors.

The hope of this program is to ensure that all employees are always in good health and prime condition, so that they can provide the best performance for the company. "This Medical Check Up is not only to fulfill the company's obligations in accordance with the joint work agreement but also a form of commitment to ensure that all employees are in good health and prime condition. So that it can improve employee performance and productivity which has a positive impact on the company," said Fajar Miftahul Falah, Director of Engineering and Operations who also serves as Chairman of the Occupational Safety and Health Advisory Committee (P2K3)

Occupational health and safety is not only a necessity, but also a non-negotiable priority. Therefore, SEI invites all parties, both from industry and the general public, to jointly prioritize occupational health and safety as an integral part of sustainable development. Together, let's create a safe, healthy, and competitive work environment to achieve a better future. Because Safety Is SEI Priority!

Off Grid Communal PLTS Officially Operating in West Sumba and Southwest Sumba

Off Grid Communal PLTS Officially Operating in West Sumba and Southwest Sumba

Sumba, NTT (02/09/2024) – PT Surya Energi Indotama in collaboration with the United Nation Development Programme (UNDP) Indonesia through the Ministry of Energy and Mineral Resources (ESDM) of the Republic of Indonesia is carrying out a flagship project entitled "Accelerating Clean Energy Access to Reduce Inequality (ACCESS)" which is implemented in the Off-grid Communal PLTS Project.

In this project, there are 7 locations of Off-grid Communal PLTS spread across the West Sumba and Southwest Sumba Regions, namely Mata Wee Lima, Ekapata 1, Ekapata 2, Watukarere, Dangga Mango and Gaura with a total capacity of 218.9 kWp which have been inaugurated by the National Project Manager of UNDP Indonesia, Mathilde Sari Gokmauli, Program Manager of UNDP Indonesia, Gwen Palmos, Secretary of the Directorate General of EBTKE - ESDM, Sahid Junaidi, Regent of Central Sumba Regency, Jusuf Lery, and Regent of Southwest Sumba Regency, Kornelius Kodi Mete and attended by the Director of Marketing and Business Development of SEI, Ridwan Kurnia.

The project was successfully completed with the support of the Korea International Cooperation Agency (KOICA) by empowering local operators through training and capacity building, as well as strengthening local institutions, especially Village-Owned Enterprises or BUMDesa to ensure the sustainability of the operation of the PLTS while opening up opportunities for local economic growth.

In addition to providing lighting to the surrounding villages, this solar power installation has contributed to improving the quality of life in the surrounding communities, creating new opportunities for local development. A total of 20 BUMDesas have been established or revitalized, ensuring sustainable management and maintenance of the PLTS. Not only that, with the presence of the Off Grid Communal PLTS, BUMDesa has successfully launched various businesses, including trade, livestock and tilapia cultivation with a biofloc system, as well as services such as photocopying, cargo transportation, and excavator services that in carrying out their business activities use clean energy from the PLTS in their daily operations.

"Thank you for the cooperation that has been established from various parties until the completion of this ACCESS Project. We hope that with this PLTS, it can increase community empowerment in terms of economic development, welfare and literacy which will support the achievement of clean and sustainable energy development in Indonesia." Said Ridwan Kurnia in between his activities accompanying the group during the inauguration session.

This Off Grid Communal PLTS will be fully operated by the Village with the support of local operators involving 46% of women as operators in all Villages who have been equipped with training and certification programs including SEI which has participated in providing qualified training for the smooth operation of the Long-term PLTS.

Together with the Government and various related parties, SEI continues to strive for electricity access that can be reached by all people towards a more equitable and sustainable energy future. Of course, the success of this project can be an achievement achieved through collaboration, innovation, and solid commitment.**

PT Surya Energi Indotama Contact Us:
Surya Energi Indotama

PT Surya Energi Indotama

PT Surya Energi Indotama (SEI) was established on December 6, 2007, and was taken over as a subsidiary of PT Len Industri (Persero) on January 14, 2009.